Ovrod 80kw CCS2 Max Power Movable Portable DC Fast EV Charger Electric Vehicle Charging Station

Customization: Available
Charge Method: Quick Charge
Installation: Portable

Product Description

📊

Basic Information

Model NO.
DC040-111
Charging Interfaces
One Pile with One Charge
Start Mode
APP, RFID Card, Remote Control
IP Rating
IP32
Certification
CE, ISO, TUV, RoHS, FCC
Output Power
80kw
Leakage Protection
A/A+6
Interface Standard
Gbt / CCS2
🖼️

Product Display

DC Fast EV Charger Station
📝

Product Description

Smart Charging Series

This classic wallbox product is designed to comply with North American standard SAE J1772 (Type 1), European standard IEC 62196-2 (Type 2), and Chinese standard GB/T. It offers a maximum output power of 40kW / 80kW variants.

Features include a 4.3-inch LCD charging display, button switch, and a built-in Type A 30mA AC+6mA DC leakage protector to ensure user safety. The durable housing design has an IP32 protection rating, ensuring it is waterproof and dustproof for reliable use.

Parameter CCS2 Standard GBT Standard
Product ModelJG series
Dimensions317*140*393mm
Voltage230Vac±15%220Vac±15%
Power / Amperage16A(max)/ 7kW16A(max)/ 7kW
InstallationIndoor/Outdoor (IP54/IP32)
Multiple ProtectionGround, leakage, over-voltage, over-current, over-temperature, lightning protection.
MaterialEnclosure: PC+ASA, Cable: TPU/EV
Operating Temp-25℃ to +50℃
📜

Certifications & Shipping

Industry Certifications
Packaging and Shipping

Frequently Asked Questions

Q1: Are you a trading company or a manufacturer?
We are a professional EV charging station manufacturer with over 9 years of industry experience.
Q2: What is your typical delivery time?
Generally, it takes 3 to 25 days after receiving your advance payment. The specific time depends on the items and the quantity of your order.
Q3: Do you support customization like LOGO or colors?
Yes, we support customization for LOGO, colors, cables, enclosure boxes, and cartons to meet your specific needs.
Q4: How long does it take to fully charge an electric vehicle?
It depends on the car's battery capacity and the charger's power. Calculation: Charging Hours = Battery Capacity (kWh) / Charger Power. For example, a 40kWh battery with a 7kW charger takes approx 5.7 hours.
Q5: Are the chargers tested before shipping?
Yes, all major components are tested before assembly, and each finished charger undergoes a full functional test before being shipped.
Q6: What certifications do your products hold?
Our products are certified with CE, RoHS, FCC, ISO, and TUV standards, ensuring global compliance and safety.

Related Products